Drilling of hydrogeological wells in order to drain the mine workings with the use of the dry rotary and percussion method of up to 60 m with a final diameter of 419 mm
Drainage project of the construction excavations, industrial excavations, landfills and comprehensive performance of the land drainage projects with the use of the method of the depression wells
Identification of the ground and water conditions of the areas of the planned investments through: test drilling, reconnaissance drilling and ground bed sounding
Assembly and replacement of the deep-well pump units
Collection of the ground and ground water samples in order to determine their parameters
Drilling of the observation wells in order to monitor ground water
Performance of the drainage wells and installation of the wellpoints
Drilling in order to determine the geotechnical conditions of the foundation of the construction works, road works and driving of the piles
Renovation, cleaning and activation of the deep wells and piezometers
Liquidation of the unnecessary wells and water intakes
Performance of the water supply wells for the industrial or private purposes
Cleaning of the sewage system, removal of the blockages in the pipes.
Drilling of the hard mineable wells for the needs of the mining plants
Instrumentation in the deep wells (removal of the detached pumps, cables etc.)